Just to give a bit of background, I manage a Scout Group based in South Gloucestershire and we are lucky enough to own our scout hut (10 years old).
We have recently been donated a Minerva MZX-250 panel together with numerous detectors (830OPH), sounders (LPSB3000) and call points (CP820) - the system was removed from a relocated company.
As an ex-electrician, I am more than happy to install this panel (together with the help of a professional company to test it!).
However I am no longer in the 'trade' and would like some general information on setup.
I am looking to have 3 zones (main hall is 15m x 8m) and then a zone for the kitchen area and then a zone for the other rooms.
Any advice would be gratefully received.
Regards
Giles Ogram
1st Winterbourne Down & Buryside Scout Group
http://www.winterbournedownscouts.co.uk
Just to give a bit of background, I manage a Scout Group based in South Gloucestershire and we are lucky enough to own our scout hut (10 years old).
We have recently been donated a Minerva MZX-250 panel together with numerous detectors (830OPH), sounders (LPSB3000) and call points (CP820) - the system was removed from a relocated company.
As an ex-electrician, I am more than happy to install this panel (together with the help of a professional company to test it!).
However I am no longer in the 'trade' and would like some general information on setup.
I am looking to have 3 zones (main hall is 15m x 8m) and then a zone for the kitchen area and then a zone for the other rooms.
Any advice would be gratefully received.